C95400 Copper Pipe
C95400 Copper Pipe is one of the components that is needed in air conditioning and refrigerant system. The tube is used as a path for the refrigerant to flow between system components and to contain it from escaping to the atmosphere. Sizing, installation layout and fittings must be done properly to ensure that the system runs efficiently.
Copper tube is one of the components that is needed in air conditioning and refrigerant system. The tube is used as a path for the refrigerant to flow between system components and to contain it from escaping to the atmosphere. Sizing, installation layout and fittings must be done properly to ensure that the system runs efficiently.
During installation, it is of utmost importance that moisture, dirt and other contaminants are prevented from entering the system. These foreign particles will affect the performance of the system and may even cause damage to some of the components.
During the production of the copper tube, the inside of the tube has been cleaned and dried before being sealed at both ends to ensure that it remains that way. You must check to make sure that the refrigerant that is going to be used does not react with the copper. Ammonia refrigerant will react with copper hence it should not be used. Instead, the stainless steel tubing type will have to be used.
|
item |
C95400 Copper Pipe |
|
Type |
Straight Copper Pipe |
|
Application |
airplane or boat |
|
Specification |
Any Size Can be Customised |
|
Grade |
Min 83% Copper |
|
Length |
3657.6mm |
|
Cu (Min) |
83 |
|
Alloy Or Not |
Is Alloy |
|
Ultimate Strength (≥ MPa) |
586 |
|
Elongation (≥ %) |
12 |
|
Wall Thickness |
standard |
|
Outside Diameter |
28.6mm-228.6mm |
|
Model Number |
C95400 |
|
Processing Service |
Bending, Welding, Cutting |
|
Product Name |
Copper Pipe |
|
Material |
Cu Min 83% |
|
Usages |
Industial |

FAQ:
how can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;
How long is your delivery time?
The products will be delivered ASAP on the basis of the quality assurance. Generally,samples order's delivery time is 6-10 days.Container orders are about 15-20 days.
What product information do I need to provide?
You need to provide the grade, width, thickness, coating and the number of tons you need to purchase.
what services can we provide?
Accepted Delivery Terms: FOB,CFR,CIF,EXW,FAS,CIP,FCA,CPT,DEQ,DDP,DDU,Express Delivery,DAF,DES;
Accepted Payment Currency:USD,EUR,JPY,CAD,AUD,HKD,GBP,CNY,CHF;
Accepted Payment Type: T/T,L/C,D/P D/A,MoneyGram,Credit Card,PayPal,Western Union,Cash,Escrow;
Language Spoken:English,Chinese,Spanish,Japanese,Portuguese,German,Arabic,French,Russian,Korean,Hindi,Italian
Hot Tags: c95400 copper pipe, China c95400 copper pipe manufacturers, suppliers, factory



