Tp2 Copper Tube For Refrigerator
It has good electrical conductivity, thermal conductivity, corrosion resistance and processing properties, and can be welded and brazed. It contains less impurities that reduce electrical conductivity and thermal conductivity, and a small amount of oxygen has little effect on electrical conductivity, thermal conductivity and processing properties, but it is easy to cause "hydrogen disease", and it is not suitable for processing (annealing, annealing, welding, etc.) and use.
tp2 copper tube for Refrigerator has good electrical conductivity, thermal conductivity, corrosion resistance and processing properties, and can be welded and brazed. It contains less impurities that reduce electrical conductivity and thermal conductivity, and a small amount of oxygen has little effect on electrical conductivity, thermal conductivity and processing properties, but it is easy to cause "hydrogen disease", and it is not suitable for processing (annealing, annealing, welding, etc.) and use.
|
Customized services |
Accept |
|
Type |
tp2 copper tube for Refrigerator |
|
Material |
C1220,C12000,C10200,T1,T2,T3,TP2,TU1,TU2,TU3,H62, |
|
Standard |
GB/T17791-2007,GB/T1527-2006, GB/T18033-2007, YS/T450-2002 |
|
Shape |
Round,Square,Rectangular,Oval,half-round |
|
OD |
3.5-300mm |
|
Thickness |
0.3-9mm |
|
Length |
3-36m or upon request |
|
Temper |
O-H112; T3-T8; T351-T851 |
|
Surface |
Mill finish, polished, anodizing, brushing, sand blasting, powder coating,etc |
|
Package |
Plastic bags or heat shrinkable packaging,wooden pallet or wooden box |
|
Application |
Water tube, Air condition or Refrigerator, Water heater |
|
Payment |
30% T/T deposit in advance, 70% T/T balance within 5 days after B/L copy or 70%T/T balance, 100% Irrevocable L/C at sight, 100% |
|
Advantages |
1. Reasonable price with excellent quality |
FAQ:
Q. How do you control quality ?
A: Mill Test Certification is supplied with shipment, Third Party Inspection is available. and we also get ISO,SGS Verified.
Q: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers requirement.
Q:What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after we received your deposit
For production period, it usually takes about 15 days-30 days after receiving the deposit.
Hot Tags: tp2 copper tube for refrigerator, China tp2 copper tube for refrigerator manufacturers, suppliers, factory



